Extension (E01) and Partial Refurbishment of Block (B) at Atlantic Technological University Sligo

Location: Sligo, Co. Sligo

The redevelopment works at ATU Sligo have been completed and handed-over to the University.

The works comprised the construction of a new four storey extension and plant room to the South and West of the existing Block B along with the demolition of the existing single storey structure, Block J and part of Block B; partial refurbishment of the remaining B block; the construction of new administration, science and research facilities, IT facilities, together with a glazed link to the adjoining E(02) building; interface works; upgrading of existing circulation spaces; and siteworks, drainage and associated landscaping. The area of the new extension is 3,950m² with refurbished spaces totalling 430m².

Accommodation comprises mixed teaching and research facilities including undergraduate and postgraduate science laboratories, clean room, PC laboratories, project rooms, classrooms, research facilities, online leaning facilities together with staff and ancillary accommodation and associated external works.